A clearly structured journey from the first idea through to turnkey handover – so you always know where your project stands.

Approx. 1–2 weeks
01

Project analysis

We review the approved design in detail: building permit, permit planning (stages 3–4), specification and floor areas. By the end of this step you have a clear picture of the project as the basis for the GU fixed-price offer.

In this step

  • Analysis of the building permit
  • Review of permit planning (stages 3–4)
  • Analysis of specification and floor areas
  • Initial cost and schedule assessment
  • Definition of the next project steps
Approx. 2–3 weeks
02

GU fixed-price offer

Based on the project analysis we prepare a transparent calculation with a clearly defined execution standard and construction schedule. By the end of this step you receive a GU fixed-price offer with a clear cost and time frame.

In this step

  • Calculation of construction costs (cost groups 300 / 400)
  • Preparation of a construction schedule
  • Definition of the execution standard
  • Drafting of the GU fixed-price offer
  • Clarification of open points with the client
Approx. 8–12 weeks (up to ~90 days)
03

Execution planning

We develop the technical execution planning, coordinate structural engineering and building services and define all construction details. By the end of this step the project is technically fully prepared for implementation.

In this step

  • Preparation of execution planning
  • Coordination of structural engineering and MEP
  • Development of all construction details
  • Preparation of bills of quantities
  • Coordination of all planners involved
Approx. 3–4 weeks
04

Project preparation

We organise the construction phase operationally: selecting and commissioning subcontractors, planning site set-up and logistics, and finalising the construction schedule. By the end of this step the site is fully prepared to start works.

In this step

  • Selection and awarding of subcontractors
  • Planning of site set-up
  • Organisation of site logistics
  • Finalisation and detailing of the construction schedule
  • Alignment of processes with all project participants
Project-specific (typically 12–24 months depending on project size)
05

Construction execution

We deliver the construction project with clear control of costs, schedule and quality. All trades are coordinated, progress is documented and checked regularly. By the end of this step the building is structurally complete.

In this step

  • Coordination of all trades on site
  • Ongoing cost and schedule tracking
  • Continuous quality control
  • Regular construction progress reports
  • Documentation of the construction process
Approx. 2–3 weeks
06

Acceptance & handover

After technical acceptance we rectify any remaining defects, hand over the documentation and present the keys. By the end of this step you receive your property turnkey and ready for use.

In this step

  • Technical acceptance of the works
  • Rectification of defects
  • Compilation and handover of documentation
  • Key handover
  • Final review of the project

TE-MI Bau GmbH takes on projects once a building permit has been granted and delivers them turnkey as a general contractor. From the start of collaboration through to site start the pre-construction phase typically takes around 3–4 months, depending on project size and complexity.

Our guarantees

What we promise you

01

Clear cost structure

A transparent calculation forms the basis of every project. We create clarity at an early stage regarding scope, costs and processes.

02

Structured project management

Professional planning and coordinated construction workflows ensure smooth project progress. All trades are managed and aligned efficiently.

03

High quality standard

Regular inspections and structured site supervision ensure precise execution. Quality is our priority in every construction phase.

04

Personal support

A dedicated point of contact accompanies your project from the first coordination meeting through to handover. Short paths and direct communication enable quick decisions.

Transparent communication

You always know what is happening

Open and honest communication is a given for us. Throughout the entire project you receive regular updates on the current status.

Request consultation
Weekly status reports by email
Monthly on-site walkthroughs
Direct line to your project manager
Online site diary with photos