Postamtsgebäude, Tempelhofer Ufer
Roof extensionGU

Postamtsgebäude, Tempelhofer Ufer

Berlin2015800.000 €

Project description

Conversion of the upper storeys and conversion of the attic in the historic post office building on Tempelhofer Ufer. The existing structure was adapted and developed functionally to create high-quality usable space under the roof.

Postamtsgebäude, Tempelhofer Ufer – Image 1
Enlarge
1 / 9

Project details

  • Conversion of 2nd and 3rd upper floors
  • Attic conversion in existing building
  • Adaptation of load-bearing structure
  • Integration of new dormer and roof windows
  • approx. 800 m² fit-out area
  • Construction period: 8 months
CategoryRoof extension
LocationBerlin
Year2015
Volume800.000 €
RoleGU