
ConversionGU
Soho House Berlin – Torstraße 1
Berlin2018300.000 €
Project description
Conversion and adaptation works in the existing hotel and club operation of Soho House Berlin. The measures required precise coordination with the operator and a tightly scheduled construction organisation so as not to affect hotel and event operations.

Enlarge
1 / 1
Project details
- Fit-out and modernisation in existing hotel
- Works during ongoing hotel operation
- Fire protection measures in existing building
- Precise construction and interface coordination
- Integration of functional acoustic solutions
- Construction period: 4 months
CategoryConversion
LocationBerlin
Year2018
Volume300.000 €
RoleGU

